The Value of Crane Warning Systems to Responsible Crane Operation
2022-10-13 15:45:36


Crane Warning Systems Computer Replacement

lmi-5.jpg


It is a crane owner’s or operator’s nightmare:  By accident or carelessness a crane boom topples, causing physical damage, often substantial, but more tragically, injuries or loss of life.

Crane accident causes are many – typically involving overloading (exceeding weight limitations), operating the equipment in high wind, or other conditions that exert additional strains on the unit’s lift and lift management capabilities.  Crane warning systems are valuable tools that can help prevent these incidents.

It is important to realize that crane warning systems do not alert operators to dangers such as siting the crane on unstable ground or failure to properly set and extend outriggers.  Only training and common sense can prevent accidents of this type.

Many crane accidents were and are preventable by installing and maintaining crane warning systems called Load Moment Indicators (LMI).  These are software-based crane warning systems that monitor and provide operators with critical information necessary to manage their lifts.  Among other functions they take into account the rated capacity of the crane, warn of impending contact between the crane hook and the boom tip, and factor in external forces such as wind.

This post describes the importance of load moment indicators that signal potentially dangerous operating conditions.  It looks at what you as a crane owner or operator must consider when updating or replacing a malfunctioning or obsolete LMI crane warning system.

You will be provided information related to

How do Crane Load Moment Indictors Work?

You may be familiar with these instruments but there is always value in a little refresher.  This information may be useful when you have to go to your boss to repair or replace your LMI crane warning system.

The Load Moment Indicator (LMI) assists the operator by providing the information they need to have a safe lifting environment on the jobsite.

Using various sensors on the crane the LMI monitors the lift and provides the operator with a continuous reading of the crane’s safe operation within the load chart.

Readings continuously change as the crane moves through the motions needed to make the lift.  If potentially unsafe conditions are approached, the LMI crane warning system will alert the operator by sounding an audible alarm and illuminating a warning light.  Many crane LMI systems will also activate a lockout feature at this point.

The LMI provides the operator with information concerning certain geometrical data such as

  • Load on the main line

  • Load on the auxiliary line

  • Boom length out

  • Boom angle

  • Radius of the lift

  • Jib angle especially for a luffing jib

  • Potential wind speed danger

  • Operating mode

There are two means by which an LMI crane warning system can function.

  1. The Load Moment or Rated Capacity Indicator

This system aids the equipment operator by sensing (directly or indirectly) the overturning moment on the equipment, i.e., load multiplied by radius.

It compares this lifting condition to the equipment’s rated capacity and indicates to the operator the percentage of capacity at which the equipment is working.

Lights and buzzers are usually incorporated as a warning of an approaching overload condition.

In this case it is critical for the operator to halt the lift and take corrective measures.

  1. The Load Moment (or Rated Capacity) Limiter

This system aids the equipment operator by sensing (directly or indirectly) the overturning moment on the equipment, i.e., load multiplied by radius.

It compares this lifting condition to the equipment’s rated capacity, and when the rated capacity is reached, it shuts off power to those equipment functions which can increase the severity of loading on the equipment, e.g., hoisting, telescoping out, or luffing out.

Typically, those functions which decrease the severity of loading on the equipment remain operational, e.g., lowering, telescoping in, or luffing in.

The system operates on the principle of reference/real comparison.

The real value, resulting from the pressure measurement and geometric sensors, is compared with the reference data stored in the central processor memory and is evaluated in the microprocessor.

An analog indication of percent capacity is displayed via an operator’s console.

When limits are reached, an overload warning signal is generated. At the same time, the crane movements that increase load moment such as hoist down, telescope out, and boom down will be locked out.

The fixed data regarding the crane, such as dimensional data, capacity charts, boom weights, and centers of gravity are stored in memory chips in the central processor unit.

This is the reference information used to calculate the operating conditions.  Boom length and boom angle are registered by the length/angle sensor, located inside the cable reel, mounted on the boom.

The boom length is measured by the cable reel cable, which also serves as an electrical conductor for the anti-two- block  (A2B) limiting switch.  [This is a safety device that prevents contact between the hook block (ball) and the end of the boom.]

Here is a sequence of operations:

  • The crane load is measured by pressure  transducers attached to the piston and rod side of the lift cylinder.


  • Controls on the operator’s console allow the operator to select the operating mode (main boom, jib, etc.) as well as the parts of the line currently in use.


  • The system will then limit operation to the capacities on the selected load chart, or the maximum permissible line pull in that configuration.


  • When operations begin the LMI powers up and  conducts an automatic test of the complete system.  After two successful system tests without errors, the system is ready for operation.  In case of a system error, both the overload and anti-two-block lights on the central unit will illuminate.  The interactive user guidance considerably simplifies the input of operating modes as well as the setting of geometry limit values.


Crane Owner/Operator Responsibilities

As indicated above the LMI is an operational aid that warns a crane operator of approaching overload conditions and over hoist conditions that could cause damage to equipment and personnel.

The device is not, and shall not, be a substitute for good operator judgment, experience and use of accepted safe crane operating procedures.  

The responsibility for the safe crane operation shall remain with the crane operator who shall ensure that all warnings and instructions supplied are fully understood and observed.

Prior to operating the crane, the operator must carefully and thoroughly read and understand the information in the user’s manual to ensure that he or she knows the operation and limitations of the crane.

Proper functioning depends upon proper daily inspection and observance of the operating instructions set forth in the operator’s manual.

 


Contact us

Add.:No.6 Gangcheng Road,Yichang,Free Trade Zone(Hubei) China 443005

86-15507209968(whatsapp)

sales@weite.tech

Keywords
Load moment indicator(LMI), crane computer, safe load indicator, Marine CCTV Camera System,Overload limiter,Crane monitoring system,Anemometer, Load cell,Length/angle sensor,A2B Limit switch, Offshore CCTV Camera System,Crane Video Camera System,Crane Safety Management System,Crane Lmi,Crane Rci,Crane Sli, WTL-A700 ,Weite Technologies Co.,Ltd
Site map